The Project consists of New Construction for Fire Access Lane & Administration Building and Renovation of Existing Building 100 & 200 at the NOCCCD School of Continuing Education
Everything look sgreat in the new admin building. However PARKING in the new lot is very TIGHT. When two cars (especially trucks) are parked there it is tight or impossible to get through. The cement blocks may need to be moved back for longer vehicles. Also the 100 building has bare stucco spots where they blasted the gates...hopefully they will redo those areas. Evrything is looking great! THANKS MTM!
1 Comments:
Everything look sgreat in the new admin building. However PARKING in the new lot is very TIGHT. When two cars (especially trucks) are parked there it is tight or impossible to get through. The cement blocks may need to be moved back for longer vehicles. Also the 100 building has bare stucco spots where they blasted the gates...hopefully they will redo those areas. Evrything is looking great! THANKS MTM!
Post a Comment
<< Home